Resources Allocation and Scheduling in Flexible Manufacturing Systems
People
(Responsible)
(Collaborator)
Abstract
In this two-year project in collaboration with Geneva University, different job scheduling techniques and resources allocation techniques have been investigated. Emphasis was given to Metaheuristic, Job shop, Combinatorial Optimization.
Additional information
Start date
01.04.1999
End date
01.04.2001
Duration
24 Months
Funding sources
SNSF
Status
Ended
Category
Swiss National Science Foundation /
Project Funding /
Mathematics, Natural and Engineering Sciences (Division II)