Ricerca di contatti, progetti,
corsi e pubblicazioni

Resources Allocation and Scheduling in Flexible Manufacturing Systems

Persone

Responsabili

Gambardella L.

(Responsabile)

Collaboratori

Mastrolilli M.

(Collaboratore)

Abstract

In this two-year project in collaboration with Geneva University, different job scheduling techniques and resources allocation techniques have been investigated. Emphasis was given to Metaheuristic, Job shop, Combinatorial Optimization.

Informazioni aggiuntive

Data d'inizio
01.04.1999
Data di fine
01.04.2001
Durata
24 Mesi
Enti finanziatori
Stato
Concluso